At Red Collar, we love complex projects and big challenges. Like any agency, we sometimes have to switch into “turbo mode.” This is the story of how micromanagement — often seen as a toxic practice — helped save a project in crisis and beat an impossible deadline.
The (micro)manager in this story is me, Olga Kulapina. I have 10 years of experience in marketing, project management, and digital product analytics. I’ve launched over 20 digital products — from promo sites to full-scale platforms. When I realized Red Collar lacked an analytics team, I built one from scratch — and have been leading it for three years now.
What you’ll learn:
- Background: how the project almost fell apart.
- How we detailed every process to speed things up and hit the deadline?
- Why the team and client didn’t rebel?
- The final result and takeaways about micromanagement.
Background: how the project almost fell apart
In 2021, a client approached us to build a digital platform for buying, selling, and delivering crushed stone. The idea was to replace messy messages like “John, I need 200 tons by Friday — what’s the price?” with a transparent digital process. But the format was unclear — marketplace, tender platform, or something else? As a product analyst, I conducted research to identify market fit, formed hypotheses, assessed risks, worked out a monetization model, and proposed a hybrid concept: a Tinder for gravel, where buyers, quarries, and brokers could match with one another.
October — Month 1: We ran initial research and defined the MVP. The project moved to development. I moved on to other projects. The release was scheduled for April to align with an industry conference, where the service’s branding and exhibition booth would also be unveiled.
At Red Collar today, a project like this would have an analytics team from day one. But this was our “pre-analytics era,” when decisions were made ad hoc.
January — Month 4: First red flag. With 3.5 months until launch, we had a brand name, style, and promo materials. But the service itself was still a prototype. The team tried to speed up and adjusted the plan:
- Backend developers started building the architecture.
- The team realized April wasn’t realistic, so they pushed the launch to the August conference.
February — Month 5: Second red flag. Architecture done. Backend had nothing left to do. Design lagging. Frontend idle. No one could clearly define the project scope. Constant changes became the norm. Everyone believed an August launch was impossible.
May — Month 8: Full-blown crisis. Three months to go. The project was handed to me — not as an analyst, but as a PM — with the words: “It must launch.” Painful but logical: I knew the product well, had a good relationship with the client, and experience managing large-scale projects.
First steps that saved the project
Step 1. Deep audit. We dug into how things went wrong. Turns out, the designer — working without analytics support — kept agreeing to client ideas and adding features. The product turned into a “plane with a pool on board” — bloated, far from the original vision, still not in design, and way off schedule.
The obvious solution would’ve been to hire more people. But first, we had to “trim the fat.” We prioritized features into groups: “not necessarily MVP,” “maybe we cut this,” and “definitely cut” — mapping each one against the client’s business goals. We kept trimming until launching in August looked at least possible on paper.
Step 2. Negotiations with the client. The phrase that saved the project: “A flying plane is better than one with a pool. The first can at least fly, the second just looks pretty.” The client agreed: focus on core features, cut the rest.
Step 3. Doubled the team. We hired more people — but only after prioritizing. New frontend devs, QA engineers, DevOps, and analysts joined. At the peak, 30 people were involved.
Still: nine women can’t make a baby in one month. Team expansion doesn’t mean linear speedup. Often, it slows things down due to communication overhead: more people = more meetings, messages, and syncing. Junior hires need mentors, which affects the mentors’ productivity. But we accepted that risk — because some speedup was better than none.
Why we went full micromanagement — and how
Two-week or even weekly sprints weren’t enough. Delays in one task stalled others. So we went into micromanagement mode.
Daily check-ins + blocker tracking. Whenever we hit a blocker, we gathered all involved and solved it that day. We were ready to rebuild processes and shift plans instantly to keep things moving. Designers, frontend, and backend worked in streams — no one waited for anyone.
Normalized overtime. Everyone knew overtime was temporary. Each person had clear instructions for autonomous work — in the evening or on weekends. We discussed weekend plans in advance during daily meetings.
Example: One week was spent building the “create request from quarry map” flow — each quarry had its own card and mini-catalog. By Friday, everything was ready: documentation, mockups, backend, frontend. On Monday, we needed to implement the same flow inside the personal account — but it required a tested base flow. So, on Saturday, QA tested it. On Sunday, one frontend and one backend dev were on call to fix any bugs.
Why the team didn’t rebel
- Confidence in success. The project manager is air traffic control. If they panic, planes crash. I didn’t panic.
- Shoulder-to-shoulder leadership. Be part of the team, not above it. I never asked, “How could you mess this up?” Instead: “We’ve got a problem. Let’s fix it. What’s the plan?” I trusted the team, asked the right questions, shuffled tasks, brought in support — I did everything I could to help.
- Individual approach. You learn everyone’s quirks after a month of close work. One dev blushes when praised in public but jokes about cats? Praise them privately and send cat memes. Another needs to vent. A third thrives on public recognition. It’s not about “fake empathy” — it’s about noticing what actually makes people comfortable. You don’t need a dossier or personality quiz. Just pay attention and care. That’s what creates a space where the team — not the manager — is the star.
- Fairness. If someone worked late, don’t scold them for missing a morning call. Anticipate it — give them a wake-up call. Promised no weekend pings because they went to the lake? Don’t ping. Promised overtime pay? Follow through, no matter what. Above all: the team is solving hard problems. Recognize their talent and effort.
- Team, not just coworkers. Weekly demos made everyone feel proud. Office folks shared a dedicated room. Meme chats thrived. People voluntarily met at night in Figma voice chats. When stuck, we ran brainstorming sessions open to all. The project felt like a game — beating the “boss,” reaching the next level together.
Why the client didn’t rebel
- No surprises — just proactive communication. We flagged risks early. Never hoped they’d just go unnoticed.
Crisis wasn’t just a threat — it was a chance to grow. A junior manager sweeps issues under the rug. A senior raises even small problems, looks for solutions, and brings them to the client with transparency.
We held weekly demos showing what was done — a map with filters, or even just a new response flow. It helped us track progress — and showed the client we were moving forward.
The result and what we learned
- The service launched right on time. The MVP was trimmed, but fully functional.
- We helped the client prep for the exhibition, present the service, and onboard the first 120 users.
- Over the next two months, we stabilized the product, fixed minor bugs, polished the docs, and added usability features.
Micromanagement worked because it was:
- About speed, not control. The team knew the goal — launch without faceplanting. We had to solve problems in hours, not days. Micromanagement served that goal — not some illusion of control.
- About people, not exploitation. The team knew it was temporary — and that the manager was right there with them.
After launch, half the team took a break. Some eventually left the company. But even years later, they write: “We miss that rush.” Because even a brutal race can be exhilarating — if everyone’s in the same boat, rowing toward the same goal. Not chained to oars in the hull.